architect's method of compensation
architect's method of compensation
4.1.1 Multiple of Direct Personnel Expenses
This cost-based method of compensation is applicable only to non-creative work such as accounting, secretarial, research, data gathering, preparation of reports and the like. This method of compensation is based on technical hours spent and does not account for creative work since the value of creative design cannot be measured by the length of time the designer has spent on his work. The computation is made by adding all costs of technical services (man hours x rate) and then multiplying it by a multiplier to cover overhead and profit.
The multiplier ranges from 1.5 to 2.5 depending on the office set-up, overhead and experience of the Architect and the complexity of the Project.
Other items such as cost of transportation, living and housing allowances of foreign consultants, out-of-town living and housing allowances of the local consultants and the like, are all to be charged to the Client and reimbursed to the Architect. At the start of the commission, the Architect shall make known to the Client the rate of professionals and personnel who will be assigned to the Project and the multiplier that has to be applied before agreeing on this method of compensation.
-from this method of compensation mga sir ask ko lang po kung magkano po ang rate ng isang architect as per hour?
-any standard rate???
o_yap1003- CGP Apprentice
- Number of posts : 242
Age : 38
Location : Philippines
Registration date : 15/03/2013
Similar topics
» 3D rates and compensation.
» LOGO DESIGN COMPENSATION
» Compensation Query: Revit Modelling and/(or) visualization
» Other method of making Ceiling
» Grass in mental ray (Non-displacement method)
» LOGO DESIGN COMPENSATION
» Compensation Query: Revit Modelling and/(or) visualization
» Other method of making Ceiling
» Grass in mental ray (Non-displacement method)
Permissions in this forum:
You cannot reply to topics in this forum