Would you like to react to this message? Create an account in a few clicks or log in to continue.

Autodesk Quantity Take Off

2 posters

Go down

Autodesk Quantity Take Off Empty Autodesk Quantity Take Off

Post by render master Wed Apr 27, 2011 8:20 am

Does anybody here using this software Autodesk Quantity Take Off

Autodesk Quantity Take Off Quantity%2Btakeoff

Autodesk® Quantity Takeoff cost estimating software helps cost estimators collect and synchronize multiformat design data and high-quality images, providing comprehensive support and enabling a smoother design-to-cost workflow. Use Autodesk Quantity Takeoff to leverage property data to automatically or manually measure, count, and price various building objects.

Features
Autodesk® Quantity Takeoff software enables the effective quantification of design data for use in estimating construction costs, enabling you to collect and synchronize design data and streamline cost-estimation processes.

Takeoff in Minutes Automatically
Quantity Takeoff provides a whole new way of working. Perform a takeoff on an entire building information model (BIM) in just minutes (not days, as with more traditional methods) through integration of 2D and 3D design data.

More Efficient Manual Takeoff
Quantity Takeoff now has more powerful manual takeoff capabilities that support the takeoff of JPG, TIF, PDF, and other “non-intelligent” image formats. Use multiple line segments, arcs, or a combination of line and arc segments when tracing geometry on a floor plan. Specify whether to treat a series of continuously drawn segments as a single takeoff measurement or as individual takeoff measurements. Rapidly perform area calculations, linear measurements, and counts, and organize your results more quickly and easily in the project catalog.

Greater Flexibility
With greater flexibility than typical databases or spreadsheets, Quantity Takeoff enables a smoother, more accurate quantity surveying workflow for cost estimators. Working in 3D, you can perform intuitive, interactive examination of models to gain a better understanding of the model for estimating purposes. Object visibility and transparency are adjustable according to building section or component type. The highly configurable project catalog makes it quicker and easier to organize design and construction objects.

Share, Query, and Clarify
Autodesk Quantity Takeoff automatically generates quantities linked to specific objects, enabling faster, more efficient navigation and takeoff. Mark up and “round-trip” your comments with integrated, intuitive redlining tools, and visually cross-reference individual objects and items, even within the most complex system of project documents.

Dynamic Counting
Count and quantify all design data related to your project more quickly and easily. Unlimited component subassemblies enable easier categorization and quantification of materials that make up individual building components. Use the Search Takeoff function for a faster takeoff of similar intelligent drawing objects, seamlessly organize them in the project catalog, and immediately analyze your results in the powerful quantity takeoff workbook.

Faster and More Insightful Quantity Reports
Using Quantity Takeoff’s flexible reporting capabilities, estimators can run high-level summaries and detailed quantity surveying reports more quickly and easily. They can also export their report results to Microsoft® Excel® or publish to Autodesk® DWF™ formats.

Link here
Autodesk Quantity Take Off 2011

Autodesk Quantity Take-Off 2012
render master
render master
Game Master
Game Master

Number of posts : 3274
Age : 104
Location : riyadh, saudi arabia
Registration date : 27/09/2008

Back to top Go down

Autodesk Quantity Take Off Empty Re: Autodesk Quantity Take Off

Post by render master Wed Apr 27, 2011 8:26 am

just want to know your feedback with the program. Dont know yet its potential compare to Revit Architecture
render master
render master
Game Master
Game Master

Number of posts : 3274
Age : 104
Location : riyadh, saudi arabia
Registration date : 27/09/2008

Back to top Go down

Autodesk Quantity Take Off Empty Re: Autodesk Quantity Take Off

Post by bicolano Wed Apr 27, 2011 9:26 am

thanks for the share. pag aralan ko to...
bicolano
bicolano
CGP Apprentice
CGP Apprentice

Number of posts : 473
Age : 41
Location : PH/BH
Registration date : 12/11/2008

Back to top Go down

Autodesk Quantity Take Off Empty Re: Autodesk Quantity Take Off

Post by Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum